Climate crisis management in logistics: the 24-hour playbook before a severe event
Mateus Lima
CEO
··6 min read
When a storm hits the logistics operation, a large part of the damage was decided a day earlier. It was on the eve that someone kept the normal shift schedule, left sensitive cargo in an uncovered yard, or did not warn the customer about the risk of delay.
Climate crisis management in logistics begins before the crisis. This playbook organizes the 24 hours that precede a severe weather event into four windows: what to decide in each one, who decides, and with what data.
Monitoring severe weather events: what public weather forecasting delivers
Alerts from INMET and Defesa Civil play an important role: they warn that a severe event is approaching a region. For those operating yards, distribution centers, and routes, they stop at two points.
The first is scale. Official warnings cover large areas, which usually span several municipalities, and the most widely used open weather forecasting models work with a grid of about 25 km. This tells you it may rain heavily in the city. It does not tell you whether the distribution center in the industrial zone or the terminal yard is in the highest risk range.
The second is translation. An orange INMET warning indicates danger, but it does not say whether the team should stop lifting operations, bring forward dispatches, or evacuate open areas. That decision depends on the limits of each asset, and only the company knows those limits.
Monitoring severe weather events in logistics requires data at the asset's location and decision rules defined before the event. That is what this playbook organizes.
Climate emergency protocol for logistics: triggers by time window
T minus 24 hours: confirm and prepare
The forecast still carries uncertainty, but it already indicates the day and the type of event. In summer storms, it points to favorable conditions in the region, not the exact spot where the rain will fall. This is the window for low-cost decisions:
confirm which assets are in the risk area and for which hazards;
put shift and maintenance teams on pre-alert;
review the next day's schedule and call in reinforcements, if needed;
check contingency materials, such as pumps, tarps, generators, and tie-downs;
identify customers and deliveries that may be affected.
T minus 12 hours: decide
The forecast gains reliability in timing and intensity, although isolated storms can still surprise. This is the window for yard, route, and dispatch decisions:
bring forward or postpone dispatches and inbound receipts;
move sensitive cargo to covered or elevated areas;
reschedule lifting operations and work at height;
notify customers and carriers about window adjustments.
T zero: execute
In the hours leading up to the peak, the protocol is execution, not discussion:
suspend activities whose trigger has been reached;
pull teams out of open areas when lightning is nearby, and only resume after about 30 minutes without discharges;
monitor weather radar and very short-range alerts, which update every few minutes;
log each decision with a timestamp.
Post-event: resume and record
After the peak, the urge is to resume operations. Before that, it is worth inspecting structures and access points, releasing areas in stages, and closing out the event record while the information is still fresh. This record is what supports the force majeure documentation, should a contractual dispute arise later.
Climate crisis in the logistics operation: who decides what and with what data
A playbook with no owner becomes a list of suggestions. Use the structure below as a starting point and adapt the roles to your operation's vocabulary:
T minus 24h, operations management. Decides on pre-alert and shift reinforcement. Needs hazards forecast per asset and confidence level.
T minus 12h, coordination for each asset. Decides on rescheduling, moving cargo, and notifying customers. Needs forecast timing and intensity at the asset's location.
T zero, shift supervision. Decides on suspension and evacuation. Needs the trigger reached, radar, and real-time lightning data.
Post-event, operations management. Decides on resumption and signs off the record. Needs the inspection and the observed event data.
The most important rule: the shift supervisor does not need to ask for authorization to act when the trigger is reached. Authorization was granted when the playbook was approved. Without this, the protocol stalls exactly in the window where deciding fast matters most.
Post-event: record and proof
The event record serves three purposes. It shows the insurer and the customer that the company acted with due diligence. It supports a possible force majeure documentation, should a contractual dispute arise. And it feeds the review of the climate crisis management playbook in logistics.
The minimum record includes the alerts received and their timestamps, the decisions made in each window, who made each one, the conditions observed on site, and the impacts: hours stopped, damages, and deliveries affected.
How to measure climate crisis management in logistics
After a few events, four indicators show whether the playbook is working:
Average lead time: how many hours before the event the first decision was made.
Events captured: how many of the events that affected the operation were anticipated by the alert.
False alarms: how many times the operation prepared for an event that did not occur.
Impact per event: whether the average cost per occurrence has dropped compared to historical data.
The second indicator depends directly on the quality of the alert. In a technical study by i4sea, the model captured 20 of 21 real shutdown events, with 95% sensitivity. i4sea monitors 18 climate hazards at a resolution of 1 to 3 km, across more than 100 assets in Latin America and Europe.
Before buying an alert service, it pays to measure the exposure of one asset. The free climate risk diagnostic shows which hazards reach that point, with what historical frequency and in which windows, the same input that feeds the decisions in this playbook.
References
i4sea. Technical study on shutdown event capture: 20 of 21 events, 95% sensitivity.
i4sea. Product data: 18 hydrometeorological hazards, resolution of 1 to 3 km, more than 100 assets monitored.
INMET. Weather warnings and danger levels (yellow, orange, and red). avisos.inmet.gov.br
We use analytics cookies to understand how the site is used and marketing cookies to measure our campaigns. They are only enabled with your permission.