Climate risks in industry: how to avoid production stoppage

Mateus Lima
Mateus Lima

CEO

5 min read
Climate risks in industry: how to avoid production stoppage

Heavy rain in the yard, a lightning strike on the substation, or a windstorm that brings down a structure can stop a factory in minutes. The damage does not end with the stoppage. It spreads into yield, rework, delivery delays and, in some contracts, penalties. Climate risk in industry is a management problem: defining, before the event, what stops the line, how much each hour costs, and when to decide to stop.

What are climate risks in industry

Climate risks in industry arise when meteorological hazards, such as heavy rain, flooding, lightning, windstorms and extreme heat, hit exposed and vulnerable plant assets and interrupt production. The IPCC, in AR6, points to high confidence in the increase of extreme heat and the intensification of heavy rainfall, and lower confidence for severe storms. Where the hazard increases, the frequency with which the plant needs to prepare changes. In Brazil, climate losses add up to R$ 60 billion per year on average between 2022 and 2024, and 91% of them remain without insurance coverage (CNseg and EY, 2025). Part of this damage originates inside the plant, on the line that stopped without a restart plan.

Which climate events stop industrial production

Not every event paralyzes a factory, and not every asset is equally vulnerable. Rain and yard flooding affect access, storage and loading areas. Lightning and substation failures bring down power for an entire set of machines. Windstorms and structural damage compromise roofing, towers and overhead piping. When the event becomes an unscheduled stoppage from extreme rain, the cost rises. Extreme heat reduces equipment yield and overloads climate control. Frequency also matters: the last decade recorded about three times more extreme events in the country (Atlas Digital MDR). Each critical asset needs an identified dominant hazard, the event that alone has the highest chance of paralyzing it.

The real cost of unscheduled stoppage

The cost of a stoppage tends to be underestimated because it appears on several lines at the same time. Downtime enters as lost production. Yield drops during restart. There is rework of work-in-process material, delivery delays and, when a contractual clause exists, penalties. Calculating this cost per asset, rather than for the whole plant, is the first step to knowing how much it is worth to anticipate an action and to measure the impact on EBITDA. For the operations director, the useful number is the cost per hour stopped due to rain for each critical asset. Without it, every decision to stop becomes a gamble.

Threshold, probability and decision window

The threshold is the value of precipitation, wind or temperature above which the plant acts. It does not come from a generic table. It combines the technical threshold, at which the asset begins to fail, and the safety threshold, at which the team needs to stop to protect people. The two rarely coincide, and the decision must respect the more conservative one.

The 48 to 72 hour window is a planning reference, not a rule for every asset. The time required depends on the facility, the hazard and the procedures. When the operation requires reassigning shifts, arranging materials or shutting down the asset safely, less lead time pushes the response toward an emergency stoppage. Public forecasts, made for wide areas, often are not enough: the value of a grid cell does not represent the condition at a specific point in the plant. To decide by asset, the forecast needs to combine models, local observations and calibration with the facility's history. 1 to 3 km models help represent local phenomena. Resolution, alone, does not guarantee reliable probability.

From alert to PCP: protocol, roles and stoppage trigger

An alert without a protocol becomes noise. The process follows a timeline: alert, assessment and action. The alert arrives with the probability of the event for the asset. The assessment may include an on-site check, carried out by utilities or maintenance, but it complements the decision and does not need to be mandatory. When the alert reaches a safety criterion defined in the protocol, such as lightning risk or strong gusts over an exposed work area, the preventive action triggers without waiting for the phenomenon to manifest on the plant. The PCP decides, together with safety and maintenance: a scheduled stoppage, which reduces cost, or an emergency one, when the window has already closed.

Roles are defined before the event: who decides the stoppage, who communicates with the shift and who clears the team to return. A trigger written in advance avoids argument in the middle of the storm.

What to record after the event

For each event, record the time of the alert, the decision made, the duration of the stoppage and the real cost. The record serves two purposes. For insurance and audit, it is the proof of climate force majeure with auditable data. For management, it allows the threshold to be reviewed with real data. If it triggered too early or too late, the next cycle corrects it.

Proof in the field

At a mining asset in Chile, the alert system captured 20 of the 21 real shutdown events, 95% sensitivity (i4sea study). The gain is not only in predicting the event. It is in giving the PCP enough lead time to choose between a scheduled and an emergency stoppage.

Strategic recommendations for industry

Three decisions matter in the short term: mapping the critical asset and its dominant hazard, formalizing the stoppage trigger with the lead time each asset requires, and calculating the cost per hour stopped. The factory's climate resilience begins in the PCP spreadsheet, with a number and a protocol.

How i4sea fits in

i4cast monitors 18 hydrometeorological hazards with 1 to 3 km resolution, calibrated for each asset, and delivers the alert with the probability of the event at that point in the plant. The AI Climate Agent translates this data into an operational response: which asset, which window, which decision. Request the free climate risk diagnosis: i4sea maps your plant's critical asset, the dominant hazard and the decision window for the coming days.

CTA - EN - Free Diagnostic

Frequently asked questions

What are the main climate risks for a factory?

Heavy rain and yard flooding, lightning strikes on substations, windstorms that damage structures and extreme heat that reduces yield. The risk each one represents depends on the asset's exposure and vulnerability. Per-asset analysis indicates which event has the highest chance of affecting each critical piece of plant equipment.

How do you calculate the cost of a stoppage?

Add up lost production per hour, the drop in yield during restart, material rework, the cost of delayed delivery and any contractual penalties. Do the calculation per critical asset to prioritize the actions with the highest return.

How much lead time is enough to stop production?

It depends on the asset, the hazard and the plant's procedures. For operations that require reassigning shifts, arranging materials and shutting down the asset safely, a 48 to 72 hour interval is a good planning reference. With less time than the operation requires, an emergency stoppage is often necessary, with higher cost and risk to the team.

Alert system or public bulletin: what is the difference?

Public bulletins provide conditions for wide areas. A per-asset alert system combines models, observations and calibration with the facility's history to estimate the probability of the event at that location, compares this probability with each asset's thresholds and allows the stoppage decision to be made in advance.

References

IPCC, Sixth Assessment Report (AR6). CNseg and EY, study on climate losses in Brazil, 2025. Atlas Digital MDR. INMET and CEMADEN, meteorological and alert data. i4sea study (master deck), i4cast resolution and sensitivity.