Climate Risks in Railways: Cost of Downtime and Cargo Safety

Mateus Lima
Mateus Lima

CEO

12 min read
Climate Risks in Railways: Cost of Downtime and Cargo Safety

Climate risk on railways is the probability that a weather condition will interrupt circulation or compromise cargo, calculated before the event occurs. The granted network now exceeds 30,000 km regulated by ANTT (ANTT, 2025), but mileage does not measure exposure: risk concentrates where cargo is actually running. Managing this risk means deciding ahead of time.

  • The most recurring railway risks come from extreme rainfall, landslides and erosion in cuts and embankments, drainage siltation, and extreme heat on the rail.
  • Brazil recorded R$ 184 billion in climate-related losses between 2022 and 2024, of which 91% had no insurance coverage (CNseg/EY, COP30 2025).
  • Rail freight transport hit a record in 2025, with 554.48 million useful tons, driven by iron ore (406.59 million UT); soybeans and pulp were the cargoes that grew the most (CNT Data, Apr/2026).
  • Early decision-making reduces the cost of downtime. i4sea brings to rail the measured, auditable performance standard it applies to other critical assets.
  • Public platforms such as AdaptaBrasil map long-term vulnerability, but they do not replace short-term operational alerts for day-to-day decisions.

When a landslide hits the track near the Botujuru tunnel, in Campo Limpo Paulista, and derails a CPTM Line 7-Rubi train, the news breaks the same day (G1, 02/01/2025). It is a passenger line, but the mechanism applies to any track in cut and embankment. What does not make the news is the question every operator carries: could this have been known in advance?

At i4sea, this question increasingly comes from railway operators and those responsible for critical assets. The starting point is always the same: what can be decided before the next day's bulletin has already arrived.

Rail freight transport in Brazil hit a record in 2025, with 554.48 million useful tons transported. Growth was driven by iron ore, which accounted for 406.59 million UT.

Soybeans and pulp were the cargoes that grew the most, with increases of 12.3% and 12.6% (CNT Data, Apr/2026). More cargo running means more exposure to weather, and more cost when operations stop without warning.

What climate risks on railways are

Climate risk on railways arises from the combination of an atmospheric event and the physical vulnerability of that section of track, cut, or embankment. The rain that matters is not the one falling on the neighboring city, it is the one that saturates the slope, overflows drainage, or closes the track.

That is the difference between "it will rain" and "this slope will fail", between weather forecasting and operational climate intelligence.

AdaptaBrasil, a platform run by MCTI, works with this same vulnerability logic, but on a decade-long scale: it crosses future climate exposure with the fragility of the network. It is useful for planning investment, not for today's 2 p.m. decision about releasing a train.

At i4sea, we treat this as a management variable, not an unforeseen event. Risk enters the same spreadsheet as inventory and scheduled maintenance, with probability, lead time, and associated cost.

Main climate risks on railways in Brazil

The phenomena that most affect Brazilian railway operations are extreme rainfall concentrated in short intervals, landslides in cuts and embankments, erosion and drainage siltation, and extreme heat on the rail. Each has its own signature: rain acts within hours, heat in daily peaks, erosion over weeks during the rainy season.

Extreme rainfall is the most recurring trigger, and what brings down a slope is rarely the peak of a single isolated hour. Operational thresholds combine accumulated rainfall from the previous 72 to 96 hours with event intensity. This combination is what raises pore pressure in the soil and brings it closer to failure, as in the Botujuru episode (G1, 02/01/2025).

Extreme heat is the most silent risk. In continuous welded rail, the rail is prevented from expanding and accumulates compression. When the metal's temperature far exceeds the neutral temperature, thermal buckling occurs, the "sun kink" of railway jargon.

The risk increases with poor ballast or recent tamping, and the rail can run 15 to 20°C above air temperature. In 2023, the study that fed AdaptaBrasil identified heat as a threat to sections of the Vitória-Minas, Carajás, and Porto Alegre-Uruguaiana railways, among others (Ministério dos Transportes / AdaptaBrasil MCTI).

In lowland sections, track flooding also interrupts operations, and it depends less on local rainfall than on the entire basin that drains there. We cover this risk in detail in track flooding: how to anticipate it.

A railway stops when a weather condition exceeds the safety threshold of the rail, the slope, or the train driver's visibility, and the decision usually comes from internal protocol, not from a public warning. The most recurring reasons for closure are landslides, track flooding, lightning strikes, and extreme heat, as well as wind causing trees to fall on the catenary and dense fog.

For lightning strikes, protocol usually suspends crew work on the track, not necessarily circulation. In electrified sections, lightning also affects signaling and the overhead network, extending the effect far beyond the strike point.

Stopping for crew safety is the correct decision; the problem is stopping without advance notice, with the train already moving and no alternative route.

It is worth measuring this against what the industry already operates. MRS has reported, since 2015, rainfall risks along the network in real time and links the forecast to landslide probability, updated every five minutes (MRS Logística).

Ferrovia Centro-Atlântica issues alerts to operational areas 72 hours in advance and confirms them 24 hours ahead (FCA). Vale has an ANTT-approved project for a nowcasting alert system on the Estrada de Ferro Vitória a Minas, expected to start in November 2026 (ANTT).

What separates these cases from a generic bulletin is what gets measured: how many events the alert actually anticipates, at what false alarm rate, and how much this avoids in cost.

When the cause is a landslide, lead time of hours changes the outcome more than with any other risk, because the decision to evacuate crews and reroute a train must come before the slope fails. We cover this in detail in how to anticipate closures from landslides.

The cost of downtime on railways

The cost of one hour of a train stopped due to weather adds up lost freight, contractual penalties with the cargo owner, fixed costs of idle crew and rolling stock, and the cascading effect on the queue of trains behind the stopped train. There is no single published national figure for railways, so the honest approach is to build the calculation with each operation's own assumptions.

To make the structure concrete without inventing a market figure, consider a hypothetical scenario with stated assumptions. A train carries 40,000 useful tons and the section closes for 12 hours after a landslide.

The calculation has four lines: freight for cargo not delivered within the window, the contractual penalty for delay, the fixed cost of idle rolling stock and crew, and the cascading effect on trains following behind. Fill in each line with your contract's figures and the hourly cost stops being abstract.

The mechanism repeats across any critical asset: the later the decision to stop is made, the greater the cascading effect on what follows that asset. The interval between an early decision and a reactive decision is exactly what a calibrated alert buys.

To bring the figure to the CFO, we detail the calculation methodology in how to calculate the impact of climate risks on EBITDA. The reasoning is the same, whether the asset is a power plant, a mine, or a railway section.

Cargo safety: what weather compromises beyond stoppage

Weather compromises cargo in three ways beyond delaying the train: moisture that degrades grains and pulp, heat that alters the stability of specific inputs such as nitrogen fertilizers and fuels, and the impact of an emergency braking that shifts bulk ore or containers. The stoppage is the visible cost; compromised cargo only shows up in complaints weeks later.

In iron ore, traded by dry ton, moisture weighs in on three fronts: freight for transported water, handling cost, and liquefaction risk at loading. MRS reports exactly this challenge, with moisture in ore wagons and accumulation of free water, especially between October and March (MRS Logística).

For grains and pulp, among the cargoes that grew the most in the 2025 railway record (CNT Data, Apr/2026), moisture above the contractual limit turns into a price discount and rework.

This is the blind spot for those who only monitor train speed and schedule. Cargo can arrive on time and still generate losses, because the risk acted on the product, not on the route. Anticipating costs less than reacting, both on the track and in the wagon.

What AdaptaBrasil measures and what it does not answer

AdaptaBrasil, a public platform run by MCTI, measures the long-term vulnerability of railway infrastructure to climate projections. The study that fed it, conducted by Ministério dos Transportes, assessed landslides, erosion, and high temperatures on the railway network; flooding and wildfires were treated as risks exclusive to highways. It answers "where to invest in adaptation over the coming years", not "should this train stop tomorrow".

What the tool does not cover is the day-to-day operational decision: which section to prioritize in the next rainfall, which train to reroute, which maintenance window to use before the event. Where most see an unforeseen event, we see a management variable, and this variable requires data calibrated to the section, updated within hours.

The two approaches are complementary. AdaptaBrasil indicates where the network is structurally more fragile; today's operation requires another layer of data, anchored in the historical record of occurrences for that specific section.

How to anticipate climate risk in railway operations

Anticipating risk on railways means cross-referencing rainfall, wind, temperature, and the historical record of occurrences per kilometer of track, with lead times of hours to days. A fine grid helps, but a grid is not accuracy. What separates a useful alert from noise is calibration against that section's historical events, and reading probability, not an isolated bulletin.

This is the standard i4sea applies to critical assets: a model with 1 to 3 km resolution built on more than ten years of proprietary reanalysis, covering 18 hydrometeorological hazards across more than 100 assets in Latin America and Europe (i4sea data).

In a mining operation in Chile (Capstone Copper), the model captured 20 of 21 real closure events, a 95% sensitivity rate. This result came from sea and wind variables, so it does not transfer automatically to slopes or rails: it demonstrates the method, but does not replace railway-specific calibration.

Sensitivity measures how many events were captured, not the false alarm rate, which is part of any serious operational validation.

For railways, the same method becomes three questions answered in advance: what is the chance that rain will saturate this slope in the next 48 hours, which section is most exposed to flooding during the rainy week, and which extreme heat window requires a preventive speed reduction. You cannot control the weather, but you can manage the risks across every kilometer of the network.

Frequently asked questions

What is operational risk?

Operational risk is the chance that a failure in processes, people, systems, or external events will interrupt or degrade an operation. On railways, it includes mechanical failure, human error, and also weather conditions that force stoppage or speed reduction.

What are the categories of operational risk?

The four classic categories come from the Basel definition, from the banking sector, and have been adopted by analogy in infrastructure: process risk, human risk, system risk, and external risk, a category that includes weather. On railways, climate risk cuts across all four, because it affects everything from the human decision to stop a train to the physical integrity of the rail.

What is the climate risk for Brazil?

Brazil recorded R$ 184 billion in climate-related losses between 2022 and 2024, with 91% of these losses lacking insurance coverage (CNseg/EY, COP30 2025). In critical infrastructure such as railways, energy, and mining, this risk turns into operational stoppages, compromised cargo, and uninsured costs.

How could the climate crisis affect railways in 2026?

In October 2026, a strong El Niño is underway, and the typical pattern for Brazil points to more rainfall in the South, impacting the Malha Sul network and the Rio Grande corridor. Drought tends to pressure the North and Northeast, including the Estrada de Ferro Carajás, and heat is expected to rise in the Southeast and Center-West, increasing the risk of thermal buckling.

The 2024 floods in Rio Grande do Sul illustrate the scale of what is at stake for the network. The responsible approach is to monitor the probability of each event by region and asset, not to project a single scenario for the year.

What changes in the decision-making of those who operate the network

Those who decide today on closing a section, rerouting a train, or releasing moisture-sensitive cargo gain a simple advantage when they replace a generic bulletin with data calibrated to the track: the decision comes before the event. This interval separates avoided cost from losses recorded in a report.

Decide with the weather, not because of it. Request a free diagnosis to map the climate risks of your operation with i4sea.

References

ShareLinkedIn

i4sea newsletter

Get new content in your inbox.

I have read and agree to the i4sea terms of use and privacy policy

This site is protected by reCAPTCHA.

WhatsApp channel

Join the channel and share it with your team.

Request a free climate risk diagnostic